be able to list multiple assets on a pm work order. Like emergency and exit lights
J
Jonathan Mason
Yes work was "Replace ash bucket micro switches on both boilers" I want to link the work order to Boiler 1 and to Boiler 2 so that the one document is seen in the history of both assets. The only alternative at the moment is duplicate the work order, one linking to Boiler 1 and the second linking to Boiler 2.
D
Davis Wieler
It would be great to be able to have multiple assets on a work order.